Installation of 750kW Genset
Scott Posey explains Peterson capabilities as we install a 750 kW emergency standby generator set with multiple transfer switches and over sized sub-base diesel tank in Hillsboro, Oregon.
Crush It
Peterson’s Rental Division has all the equipment you need for a successful harvest.
We have three disciplines in rental: Compressed Air, Power and Temperature Control.
TEMPERATURE CONTROL
We have cooling and heating equipment in all sizes built for:
Contact Rental
Rental Office
Monday-Friday 8 a.m.-5 p.m.
Oregon and Southern Washington: All Rental Inquires
Russell LaClair
510-557-1054
rlaclair@petersonpower.com
24 Hour Emergency Service Available
Peterson Power Systems, Inc. Customer Service Agreement Terms And Conditions
Peterson Power Systems, Inc. Customer Service Agreement Terms And Conditions
- Terms and Conditions.
State-Run Facility
Peterson Power Helps A State-Run Facility
In September 2015, a state-run facility in California that serves several hundred individuals with developmental disabilities was in trouble. The facility’s main 12KV transformer failed during the night. Without the transformer functioning, the entire facility essentially shuts down, preventing it from giving adequate care to those in need. Only hours after the call came in, Peterson techs were on-site with rental equipment and support services.
Mechanical Contractor
Peterson Power Helps A Mechanical Contractor
In the summer of 2015, a full-service design build mechanical contractor was unable to maintain a comfortable temperature for its tenants. With temperatures soaring to 100°F in the summer, a functioning HVAC system is highly necessary. If not fixed, the tenants could have sued the facility for loss and damage.
Independent Refinery
Peterson Power Helps An Independent Refinery
A leading, independent refinery and marketer of petroleum products in California was obligated to follow air pollution regulations. Due to the lack of maintenance to the refinery and the high air pollution that the diesel rental equipment caused, the refinery was at risk of being fined heavily.
Department Of Administrative Services
Peterson Power Helps The Department Of Administrative Services
The Department of Administrative Services (DAS) implements the governor and legislature’s political decisions while ensuring the productive use of tax dollars. To hold the information necessary for DAS to properly function, the department maintains a small data center that is cooled by primary and backup cooling systems. In the spring of 2016, the main chiller failed, and the DAS staff had to take immediate action to prevent overheating of the data center.