FILTER BY CONTENT TYPE
Case Study

Scheduled Shutdown

Going Off Grid to Replace Switchgear

Microchip Technology, a chip manufacturer in Gresham, Oregon, recently completed a scheduled plant shutdown of their facility to replace switchgear that had been installed when the plant was first constructed back in the 1990s. To begin the shutdown, Microchip needed to disconnect from utility power and run the whole facility on generator power only, so they turned to Peterson Power Rental.

Read More